Answered step by step
Verified Expert Solution
Question
1 Approved Answer
An automotive stamping production area consists of the press and welding assembly. The press operation produces part A and part B in batches. The welding
An automotive stamping production area consists of the press and welding assembly. The press operation produces part A and part B in batches. The welding operation assembles 3 parts of part A and 2 parts of part B into automotive body components. The area manager wants to determine the optimal cycle time and batch sizes for the press operation such that the cycle time (i.e., the time between two production runs of the same product) must be the same for parts A and B. The hourly production rate of the press is 1200 parts per hour for part A and 800 parts per hour for part B. The hourly production rate for welding assembly is 100 parts per hour, e.g., the hourly demand for part A is 300 and the hourly demand for part B is 200. The press requires 3 hours of die changeover time to produce part A and 2 hours of die changeover time for part B. The order setup costs are $19.6 for part A and $14 for part B. The cost of part A is $87.6, and the cost of part B is $175.2. The company uses a 20% annual rate (assume 8760 hours in
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started