Answered step by step
Verified Expert Solution
Question
1 Approved Answer
An east-west water supply tunnel is to be constructed in bedrock at an elevation of 1,800 ft above sea level. The surface is level
An east-west water supply tunnel is to be constructed in bedrock at an elevation of 1,800 ft above sea level. The surface is level and at an elevation of 2,000 ft. The tunnel is to be 1,000 ft north of a point designated A, which is located in very weak shale. But a few hundred feet south of it is a well-consolidated conglomerate. Three holes have been drilled by "You Breccia We Can Inc."; the data are as follows, and in each case conglomerate lies below the shale. You will need to draw a map to scale using Hole A as the reference point to solve this problem. Elevation of the Shale/Conglomerate Contact above sea level 1,800 ft Hole A B C Location Reference 700 ft N50W of A 2,000 ft 010 of A 1,400 ft 0.0 ft a) What is the strike and dip of the conglomerate-shale contact? b) What is the elevation of the contact of conglomerate and shale at the location of the tunnel? c) In what rock would the proposed tunnel be located? d) where would you suggest locating the tunnel and why?
Step by Step Solution
★★★★★
3.40 Rating (156 Votes )
There are 3 Steps involved in it
Step: 1
a The intersection of conglomerate and shale occurs at a depth of ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started