Question
An electric switch manufacturing company is trying to decide between three different assembly methods. Method A has an estimated first cost of $46,000, an annual
An electric switch manufacturing company is trying to decide between three different assembly methods. Method A has an estimated first cost of $46,000, an annual operating cost (AOC) of $7,000, and a service life of 2 years. Method B will cost $86,000 to buy and will have an AOC of $3,500 over its 4-year service life. Method C costs $115,000 initially with an AOC of $6,000 over its 8-year life. Methods A and B will have no salvage value, but Method C will have equipment worth 12% of its first cost.
Perform a future worth analysis to select the method at i = 10% per year.
The future worth of method A is $ __________.
The future worth of method B is $ __________.
The future worth of method C is $ ___________.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started