Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

An embankment for a highway 30 m wide and 1.5 m in compacted thickness is to be constructed from a sandy soil trucked from a

An embankment for a highway 30 m wide and 1.5 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content, w, of the sandy soil in the borrow pit is 15% and its void ratio, e, is 0.69. The specification requires the embankment be compacted to a dry unit weight of 18 kN/m^3. Determine, for 1 km length of embankment, the following: a) The weight of the sandy soil from the borrow pit required to construct the embankment. b) The number of 10.0 m^3 truckloads of sandy soil required for the construction. c) The weight of water per truckload of sandy soil. d) The degree of saturation of the sandy soil in the borrow.

Step by Step Solution

3.42 Rating (165 Votes )

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Principles of heat transfer

Authors: Frank Kreith, Raj M. Manglik, Mark S. Bohn

7th Edition

495667706, 978-0495667704

More Books

Students also viewed these Civil Engineering questions