An engineer is constructing a building. It is known that it will take 20% more time to build each subsequent floor of the building. If
An engineer is constructing a building. It is known that it will take 20% more time to build each subsequent floor of the building. If it takes 4 months to build the ground floor of the building, how long will it take to complete the construction of a 6-floor building? (Select the most appropriate option)