Question
An engineer is planning to build a one-story building (1000 m2 (50mx20m)) and lease it for $25.00 per m2 per month. 1a. What is the
An engineer is planning to build a one-story building (1000 m2 (50mx20m)) and lease it for $25.00 per m2 per month.
1a. What is the rate of return on this investment if the total capital cost of the building is $1,300,000?
1b. What would be the rate of return if they decided to add a second story to the proposed building and lease the whole building for $20.00 per m2 per month?
Additional Data: A second story would double this size Adding a story would increase the structural costs from $600,000 to $900,000 and double the cost of the exterior enclosure that is $400,000 for the one-story building.
If the developer of a warehouse (10,000 m2 GFA and 2400 m2 wall area) were to increase the wall height from 6m to 9m, the cost of exterior walls would now be $110.00 per m2 and other costs would rise from $7,000,000 to $7,700,000. 4 marks What would be the cost per m2 and the cost per m3 of the larger warehouse
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started