An engineering design firm is considering the use of solar power for its stand - alone olfice. Two options are being considered: ( 1 )
An engineering design firm is considering the use of solar power for its standalone olfice. Two options are being considered: continue to use electric power from the grid; and remain connected to the grid but use solar with net metering to feed back into the grid when excess power is generated, resulting in a credittor future use. Energy rates anticipated for the upcoming year, per kilowatthour kwh are approximately $ tor offpeak pricing and $ for onpeak pricing. These prices are expected to increase annually at a rate of and respectively. Annual demand is estimated to be during hours considered to be onpeak" with all being. during daylight hours when solar panels are effective. "Offpeak" annual demand is when the sun is available, and when there is lack of sun. For Option costs include the energy charges for kwh used during onand offpeak times, plus a monthly "sevice charge" of $ simply for having access, regardless of kwh used. For Option in addition to the monthly "service charge," a kw solar capacity with inverter, charge controller, current limiter and interfacing will be used with no storage capacity at a cost of $; part of the demand will be provided by the solar array, and the rest particularly at night and when there is lack of sun will be provided by the utility company the grid Excess energy from the solar array will be fed back into the grid and credited back to the engineering design firm. Annual maintenance and testing will cost $ the first year, increasing by $ each year thereafter. The salvage value after years will be $ Following are the annual figures for each option:
For Option :kwh from grid:
On Peak wsun
On Peak wo sun
On Peak wsun
On Peak wo sun
For Option :kwh from solar:
On Peak wsun
On Peak wo sun
On Peak wsun
On Peak wo sun
For Option :kwh from grid:
On Peak wsun
On Peak wo sun
On Peak wsun
On Peak wo sun
For Option :kwh returned from grid:
On Peak wsun
On Peak wo sun
On Peak wsun
On Peak wo sun
Company management wants lo decide between the two allernatives. The planning horizon is years and annual interest is Determine the PW of each alternative using present worth analysis. In calculating present worth, lef costs be posifivevalued and salvage value be negativevalued. Use the monthly service charge to calculate the amount paid annually.
Option $
Option
Which option should be selected:
Option or Should be chosen as it has the Lower or greater PW of cost
Pick one of which that is in the parenthesis.
End of document
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started