An Engineering workshop allocates its staff into four categories: Designer, Joiner. Painter and Assembler. It is estimated that the time spent on their main products
An Engineering workshop allocates its staff into four categories: Designer, Joiner. Painter and Assembler. It is estimated that the time spent on their main products in hours are as follows: Product I Product 2 Product 3 Designer 6 4 2 Joiner 4 3 Painter 2 2 2 Assembler l 4 3 The wages. pension contribution and overheads in dollars per hour are known to be: Designer .Ioiner Painter Assembler Wages 1D 1 [l 22 21 Pensions 3 4 3 2 lUserheads l [I (I l i] Represent the above information on time spent {matrix T) and cost (matrix C} on each product {Product 11 Product 2, Product 3] as two matrices. [1|] marks] ii] Find the total time spent by each staffto produce each product. [1|] marks] iii] Use matrix multiplication to find the total cost in dollars of producing each product and total cost. [1|] marks]
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started