An entity purchased land as factory sites for 700.000. The entity paid 60.000 to tear down the buildings on the land. Salvage was sold for
An entity purchased land as factory sites for 700.000. The entity paid 60.000 to tear down the buildings on the land. Salvage was sold for 5400, legal fees of 3480 were paid for tittle investigation and making the purchase. Architects fees were 31.200. Tittle insurance cost 2.400 and liability insurance during construction cost 2.600. Excavation cost 10.440. The contractor was paid 3.200.000. An assessment made by the city for pavement was 6.400. Interest cost during construction were 170.000. The cost of the land that should be recorded by the entity is.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3