An entity started construction on a building for its own use on 1 April 2 0 X 7 and incurred the following costs: $ 0
An entity started construction on a building for its own use on April X and incurred the following costs:
$
Purchase price of land
Stamp duty
Legal fees
Site preparation and clearance
Materials
Labour period April to July
Architects fees
General overheads
The following information is also relevant:
Material costs were greater than anticipated. On investigation, it was found that materials costing $ million had been spoiled and therefore wasted and a further $ million was incurred on materials as a result of faulty design work.
As a result of these problems, work on the building ceased for a fortnight during October and it is estimated that approximately $ million of the labour costs relate to this period.
The building was completed on July X and occupied on September X
Required:
Calculate the cost of the building that will be included in tangible noncurrent asset additions.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started