An entity started construction on a building for its own use on 1 April 20X7 and incurred the following costs: $000 Purchase price of
An entity started construction on a building for its own use on 1 April 20X7 and incurred the following costs: $000 Purchase price of land 250,000 Stamp duty Legal fees 5,000 10,000 Site preparation and clearance 18,000 Materials 100,000 Labour (period I April 2007 to 1 July 2008) 150,000 Architect's fees 20,000 General overheads 30,000 583,000 The following information is also relevant: Material costs were greater than anticipated. On investigation, it was found that materials costing $10 million had been spoiled and therefore wasted and a further $15 million was incurred on materials as a result of faulty design work. As a result of these problems, work on the building ceased for a fortnight during October 2007 and it is estimated that approximately $9 million of the labour costs relate to this period. The building was completed on 1 July 20X8 and occupied on 1 September 20X8. Required: Calculate the cost of the building that will be included in tangible non-current asset additions.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
The question involves calculating the cost of the building that will be included in tangible noncurrent asset additions considering the additional information provided Lets break down the costs and ad...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started