Question

1 Approved Answer

An established manufacturer is building a plant in North Carolina and they are evaluating various flood control measures as they have seen problems during construction

image text in transcribed

An established manufacturer is building a plant in North Carolina and they are evaluating various flood control measures as they have seen problems during construction that indicate they will have problems later. The company is look at 4 options below and since they are cash strapped, they are looking at this analysis with an 22 % required return and a 15 year life. Which option would you recommend? Option 1 Full System - Has large water retention pond, sump pumps, generator for back up power. It will require CAPEX of $2,500,000, and require annual maintenance/testing of $15,000, but prevent damage from a 100 year flood, so we will assume No damage cost. Partial System - Has a medium retention pond and sump pumps, but no back up generator. It will require CAPEX of $1,500,000, and require Option 2 annual maintenance/OPEX of $10,000. There is a 5% chance (assume annually) that the plant will still have outages/damage from a major storm that could cost $3,500,000. a Option 3 Minor System - Has a medium retention pond and no sump pumps, but no back up generator. It will cost $200,000, and require annual maintenance of $1,000. There is a 10% chance (asssume annually) that the plant will still have outages/damage from a major storm that could cost $3,800,000 No System - Wait and See. There is a 15% chance (asssume annually) Option 4 that the plant will still have outages/damage from a major storm that could cost $4,500,000. A. Option 1 B. Option 2 C. Option 3 D. Option 4

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Liquidity Risk Management In Banks Economic And Regulatory Issues

Authors: Roberto Ruozi, Pierpaolo Ferrari

1st Edition

3642295800, 978-3642295805

More Books

Students also viewed these Finance questions

Question

15.2 Explain the costs associated with employee turnover.

Answered: 1 week ago