An infrastructure asset developer is planning to build a 2 x 250 megawatt (MW) coal- fired electric power plant in an Asian country. Estimated investment
An infrastructure asset developer is planning to build a 2 x 250 megawatt (MW) coal- fired electric power plant in an Asian country. Estimated investment cost is about USD (U.S. Dollar) 500 million. The Chief Financial Controller of the developer has been negotiating with several bank groups to raise USD 350 million project financing. One leading project finance bank submits bid to raise the syndicated project finance loan.
(a) The project finance bankproposestosolelyand fullyunderwrite thefull amountof theproject finance loanwith thefollowing syndication strategy (Syndication strategy 1).
The syndication stages are as follows:
- The soleprojectfinance ("LeadArranger") underwrites the entireamountofprojectfinanceloan
- TheLead Arranger invitesand contracts withthree(3)sub-underwriters(Co-Lead Arrangers)to commit USD87.5 millioneach
- Thisis followedby general syndicationwhich bringsin a further six(6)participating banks(Managers)to join the transaction, eachcommitting USD35 million.
- On completion of the syndication, the final-takecommitmentof the Lead Arrangerand the Co-Lead Arrangerswill be reducedtoUSD35million each.
TheLead Arrangers determinethat for its solefully underwrittenbid,it willtake a praecipiumof 5 bp flat (on thefull projectfinance amount) from thearrangementfee. TheLead Arrangerand the Co-Lead-Arrangerswill eachreceive 45 bp flaton the underwrittenamount. Each manager will receive25 bp flatfor theparticipation amount.
(note : bp means basis point. Each bp is equal to 0.01%)
- Compute the fee payable to each groupof Lead Arranger,the Co-LeadArrangersandthe Managersand the total arrangementfee payable to the lenders inSyndication Strategy1.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Charge breakdown for Partnership Procedure 1 1 Praecipium Lead Arranger as it were Praecipium rate 5 ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Document Format ( 2 attachments)
663d4a74bd124_968408.pdf
180 KBs PDF File
663d4a74bd124_968408.docx
120 KBs Word File
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started