An instruction pipeline has 7 stages and it is clocked at 200 MHz. How long would take to execute 1000 instructions on this pipeline. What
An instruction pipeline has 7 stages and it is clocked at 200 MHz. How long would take to execute 1000 instructions on this pipeline. What is the minimum number of instructions that would make the pipelines throughput to 50% of the maximum throughput.