Question
An OEE Case Study. The Alcorn Fabrication Company has embarked on an aggressive TPM project to cut maintenance cost, improve productivity, and shorten manufacturing lead
An OEE Case Study. The Alcorn Fabrication Company has embarked on an aggressive TPM project to cut maintenance cost, improve productivity, and shorten manufacturing lead times. One of the initial steps in the project, involves determining the current Overall Equipment Efficiency (OEE) on their primary slitting machines. The data shown in Table 1, was recently Spray Painter Assembly collected during a 24 hour of continuous observation of several slitting machines. Note that the data represent average time for each element per machine. The Alcorn Company operates their plant on a 5 days/week, 3 shifts per day schedule: Determine: 1)- Overall equipment efficiency for each slitter 2)- Actual production rate per hour under the current conditions. 3)- Total manufacturing lead time (MLT) for a customer order size of 8500 units. 4)- As the manager of the TPM project, determine by what % current OEE and MLT could be Improved (You need to suggest how/what elements need to be changed). What are MTTR and MTBF if the company implement your suggestions 5)- Using your answer in "4", estimate % improvement in Machine capacity* and production cost/unit. T A B L E 1 Major Equipment Losses Data Comments & Calculations A. Planned shutdown losses: (Hours) 1. No production, breaks, shift change... 2.66 Meeting & shift change 2. Planned maintenance 2.00 PM every 24 hours B. Downtime losses: (Hours) (or minutes) 3. Waiting for operator 1.66 4. Failure or breakdowns 1.33 Mechanical drive coupling 5. Setups & changeover 1.16 2 size changes 6. Tooling or part Changes 0.83 Screw station bits 7. Startup & adjustment 1.00 1 st shift Monday 8. Material Flow: Input (No material) 0 Waiting for raw materials 9. Material Flow: Output (Kanban full) 0 Output not needed; no room in queue C. Performance efficiency losses: (Count) 10. Minor stops 10 events Jam ups,...... 11. Reduced speed or cycle time 100 vs. 167 units Design rate: 180 units/hour D. Quality & yield losses: (Count) 12. Scrap product / output 2 Waste, non-salvageable 13. Defects, rework 1 14. Yield and other losses 5 Startup & adjustment related E. Other data: --- * Production cost per unit 3.25 $/unit, under current conditions * standard production rate 20 sec/unit * This must be expressed as units/week **. This is MTTR after you improve the situation (the final/suggested average time per breakdown
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started