Answered step by step
Verified Expert Solution
Question
1 Approved Answer
An underground mine development project has a 560 m shaft sinking whose diameter is 5 m; three sublevel tunnels planned at 440m, 500m and 560m,
An underground mine development project has a 560 m shaft sinking whose diameter is 5 m; three sublevel tunnels planned at 440m, 500m and 560m, respectively; and a decline to the 560 m level. The decline (cross section 5 m x 5.6 m) development has reached the 500 m level, and the tunnel (cross section 5 m x 5.6 m) development at the 440 m level has extended 200 m towards the shaft direction. Unfortunately, the decline development at the 500 m encountered major groundwater inrush and flooded the entire decline and the 440 m level tunnel. An overflow of 50 m3/hour is measured at the portal of the decline. Design a pumping system to dewater the flooded mine developments. To complete the design, your design report shall cover the following three components: 1) Overall pump stages of the pipeline and pumping system, including: the overall pumping strategy to pump the water from underground to ground surface, your own layout design drawing, and total pipeline length. 2) How long will it take to dewater the flooded space? Assume that the pump has an efficiency of 90%. Detail any other assumptions used in the design and calculation. 3)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started