Question
Anderson Company uses a conventional cost system with overhead allocated to products on the basis of direct labor hours.The company manufactures two products, for which
Anderson Company uses a conventional cost system with overhead allocated to products on the basis of direct labor hours.The company manufactures two products, for which the following information is available.
StandardUnique
Units Produced15,0005,000
Prime Cost Per Unit$85$125
Direct Labor Hours Per Unit22
Target Selling Price$125$195
Total overhead for 2007 was estimated to be $400,000.The following data reveal several activities and potential cost drivers:
ActivityCostCost Driver(unit, batch, prod, facility)
Material Handling$30,000Material moves?
Machine Set-ups$100,000Set-ups?
Engineering Support$150,000Engineering Hours?
Power for Machines$80,000Machine Hours?
Providing Space$40,00050% to each product?
Total$400,000
Each unit of the standard product requires 2/15 of a machine hour while each unit of the unique product requires 6/15 of a machine hour.Standard products are run in batches of 15 units and unique products are run in batches of 10 units.Standard products require 2 setups per each batch and unique products require 6 setups per each batch.Standard products require one material move per batch while unique products require 3 material moves per batch.Engineers spend 1,000 hours per year on standard products and 2,000 hours per year on unique products.
Requirements:
1.Estimate the cost per unit of the two products using the current cost system.
2.Indicate whether each activity is a unit, batch, product, or facility level activity.
3.Calculate the cost of the two products using ABC.How did the cost of the two products change and why?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started