answer the question
Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production 195 , 000 Fixed manufacturing overhead cost 3, 510, 000 Variable manufacturing overhead cost per machine-hour 2. 00 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job P90 was started, completed, and sold to the customer for $3,100. The following information was available with respect to this job: Direct materials Direct labor cost $ 1, 426 $ 1, 023 Machine-hours used 78 Compute the total manufacturing cost assigned to Job P90. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Compute the plantwide predetermined overhead rate. Predetermined overhead rate per MH Required 2 >Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production Fixed manufacturing overhead cost A EA 195, 000 Variable manufacturing overhead cost per machine-hour 3, 510, 000 2. 00 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job P90 was started, completed, and sold to the customer for $3,100. The following information was available with respect to this job: Direct materials Direct labor cost $ 1, 426 $ 1, 023 Machine-hours used 78 nces Compute the total manufacturing cost assigned to Job P90. Complete this question by entering your answers in the tabs below. Required 1 Required ? During the year, Job P90 was started, completed and sold to the customer for $2,500. Compute the total manufacturing cost assigned to Job P90. Direct materials Direct labor Overhead applied Total manufacturing cost