Approximately Relevant ABC Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the cylinders in the Cutting and Welding
Approximately Relevant ABC
Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the cylinders in the Cutting and Welding Department. Other parts and the subassembly are then assembled in the Assembly Department. The activities, expected costs, and drivers associated with these two manufacturing processes are given below.
Process | Activity | Cost | Activity Driver | Expected Quantity |
Cutting and Welding | Welding | $ 776,000 | Welding hours | 4,000 |
Machining | 450,000 | Machine hours | 10,000 | |
Inspecting | 448,250 | No. of inspections | 1,000 | |
Materials handling | 300,000 | No. of batches | 12,000 | |
Setups | 240,000 | No. of setups | 100 | |
$2,214,250 | ||||
Assembly | Changeover | $ 180,000 | Changeover hours | 1,000 |
Rework | 61,750 | Rework orders | 50 | |
Testing | 300,000 | No. of tests | 750 | |
Materials handling | 380,000 | No. of parts | 50,000 | |
Engineering support | 130,000 | Engineering hours | 2,000 | |
$1,051,750 |
Other overhead activities, their costs, and drivers are listed below.
Activity | Cost | Activity Driver | Quantity |
Purchasing | $ 135,000 | Purchase requisitions | 500 |
Receiving | 274,000 | Receiving orders | 2,000 |
Paying suppliers | 225,000 | No. of invoices | 1,000 |
Providing space and utilities | 100,000 | Machine hours | 10,000 |
Total | $ 734,000 |
Other production information concerning the two hydraulic cylinders is also provided:
Cylinder A | Cylinder B | ||||
Units produced | 1,500 | 3,000 | |||
Welding hours | 1,600 | 2,400 | |||
Machine hours | 3,000 | 7,000 | |||
Inspections | 500 | 500 | |||
Moves | 7,200 | 4,800 | |||
Batches | 45 | 55 | |||
Changeover hours | 540 | 460 | |||
Rework orders | 5 | 45 | |||
No. of tests | 500 | 250 | |||
Parts | 40,000 | 10,000 | |||
Engineering hours | 1,500 | 500 | |||
Requisitions | 425 | 75 | |||
Receiving orders | 1,800 | 200 | |||
Invoices | 650 | 350 |
Process | Activity | Cost |
Cutting and Welding | Welding | $ 2,000,000 |
Machining | 1,000,000 | |
Inspecting | 50,000 | |
Materials handling | 72,000 | |
Setups | 400,000 | |
$3,522,000 | ||
Assembly | Changeover | $ 28,000 |
Rework | 50,000 | |
Testing | 40,000 | |
Materials handling | 60,000 | |
Engineering support | 70,000 | |
$248,000 |
Other overhead activities:.
Activity | Cost |
Purchasing | $ 50,000 |
Receiving | 70,000 |
Paying suppliers | 80,000 |
Providing space and utilities | 30,000 |
$230,000 |
The per unit overhead cost using the 14 activity-based drivers is $1,108 and $779 for Cylinder A and Cylinder B, respectively.
Required:
1. Determine the percentage of total costs represented by the three most expensive activities.
%
2. If required, round your interim calculations and final answers to the nearest dollar. Allocate the costs of all other activities to the three activities identified in Requirement 1 in proportion to their individual activity costs.
Allocation | |
Welding | $ |
Machining | $ |
Setups | $ |
Calculate the total activity costs of all the three activities.
Cost pools | |
Welding | $ |
Machining | $ |
Setups | $ |
Activity Rates | ||
Welding | $ | per welding hour |
Machining | $ | per machine hour |
Setups | $ | per batch |
Now assign these total costs to the products using the drivers of the three chosen activities.
Cylinder A | Cylinder B | |||
Rate 1 (welding) | $ | $ | ||
Rate 2 (machining) | $ | $ | ||
Rate 3 (setups) | $ | $ | ||
Total overhead costs | $ | $ | ||
Unit overhead costs | $ | $ |
3. Using the costs assigned in Requirement 2, calculate the percentage error using the ABC costs as a benchmark. Round your answers to one decimal place. If an item is negative, use a minus (-) sign to indicate.
Percentage error | |
Cylinder A | % |
Cylinder B | % |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started