As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs Direct materials Direct labor overhead applied Job 102 Job 103 Job 104 $30,000 $71,000 $45,000 10,000 25,600 43,000 3,500 8,960 15,050 Job 102 was started in production in May, and the following costs were assigned to it in May: direct materials. $9,000; direct labor $3,500; and overhead, $1.225. Jobs 103 and 104 were started in June, Overhead cost is applied with a predetermined rate based on direct labor cost, Jobs 102 and 103 were finished in June, and Job 104 is expected to be finished in July, No raw materials were used indirectly in June. Using this information, answer the following questions. (Assume this company's predetermined overhead rate did not change across these months.) 1&2. Complete the table below to calculate the cost of the raw materials requisitioned and direct labor cost incurred during June for each of the three jobs? 3. Using the accumulated costs of the jobs, what predetermined overhead rate is used? 4. How much total cost is transferred to finished goods during June? Reg 1 and 2 Reg 3 Reg 4 Complete the table below to calculate the cost of the raw materials requisitioned and direct labor cost incurred during June for each of the three jobs Direct Materials May June 102 103 Job Total $ 0 0 0 104 Total Direct Labor Job May June Total $ 0 102 0 103 0 104 Total Req 1 and 2 Req 3 Req 4 Using the accumulated costs of the jobs, what predetermined overhead rate is used? Overhead Rate 1 Choose Denominator: Choose Numerator: II Overhead Rate Job 102 = Overhead rate 0 Job 103 Il Overhead rate 11 0 Job 104 11 Overhead rate 1 11 0 Req 1 and 2 Req3 Reg 4 How much total cost is transferred to finished goods during June? Job Direct Direct Materials Labor $ 30,000 $ 10,000 Applied Overhead Total Cost Cost Transferred to Finished Goods 102 103 71,000 25,600 104 45,000 43,000 Total $ 146,000 $ 78,600