Assigned Media Question Help o E4-24A (similar to) Camoy Products has adopted an ABC cooling system. The following manufacturing activities. Indirect manufacturing costs, and cost drivers have been identified: Click the icon to view the activity costs and drivers.) The Job Cost Record for Job 0624 revealed that direct materials requisitioned for the job totaled S1,040 The Job Cost Record also showed that direct labor for this job totaled 8 hours at a wage rate of $27 per hour Other data collected on the resources used by Job #624 included: Click the icon to view the other data) Read the requirements Requirement 1. Calculate the activity cost location rate for each of the five pools listed in the table. (Round the allocation rate to Requirements Activity cost Total activity cost pool Total activity allocation base allocation rate Machine setup 1. Calculate the activity cost a location rate for each of the five pool sted in per setup table 2 Calculate the total cost of Job 624 use an ABC costing system) Data Table 2. Why would ABC provide a more accurate allocation of marutacturing overhead (MOH) than a plantwiderate? 4. Assume that Carney Products used a traditional costing system rather than an ABC system is plantwide MOH rate would have been determined using director (DL) hours as the allocation base. How much cost datortion 1 machine stuproquired would have coured on this job? Enter any number in the edit fields and then click Check Answer machine hours polishing cloths Done remaining 4 quality control tests un 8 ports i Data Table . Et Irti OL Total estimated Activity Machine setup. Machining Polishing Quality control Facility-level costs. Total manufacturing overhead (MOH).. MOH costs related to activity 96,000 $ 290,000 $ 55,000 $ 630,000 $ 192,500 Total estimated amount of allocation base activity 2,400 setups 2,000 machine hours 5,000 polishing cloths 7,000 tests run cc ide 55,000 DL hours G Pr $ 1,263,500 ar S