Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Assignment: 1. Job No. 22567 Two king sized Bed order will require material of 7 feet by 5 feet OAK wood. The wood will cost
Assignment: 1. Job No. 22567 Two king sized Bed order will require material of 7 feet by 5 feet OAK wood. The wood will cost 10tk per Sqr.Feet. The labor hour those will take is 8 hours each and the per hour cost for labor is 15 tk. The Company estimate that the total Manufacturing Overhead for the period is 6,40,000 tk. and the total estimated hours the production will continue is equal to 20,000 hrs. 2. Job No. 65580 A dressing table order will require material of 60 sqr.feet Keroshin wood. The wood will cost 6 tk per Sqr.Feet. The labor hour those will take is 4 hours each and the per hour cost for labor is 10 tk. The Company estimate that the total Manufacturing Overhead for the period is 12,40,000 tk. and the total estimated hours the production will continue is equal to 1,20,000 hrs. Instructions: Prepare Job cost sheet for both the Job orders. Also prepare supplementary sheets for Material requisition and labor requisition as well. You can use MS word file to create the table or may use the MS excel. If using excel please make all the sheets in one MS excel file. you can not upload more than one file in the submission
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started