Assume that failure times were 27, 59, 89, 96, 16, 108 and 78 hours for an operation stress with an estimated scale factor of 75
Assume that failure times were 27, 59, 89, 96, 16, 108 and 78 hours for an operation stress with an estimated scale factor of 75 hours and shape factor of 2.3. . Determine the reliability of the units at a time of 70 hours. Find MTTF Find B1 life (98% life) Find median time to failure Find the design life for a reliability of 0.90 . Assume that failure times were 27, 59, 89, 96, 16, 108 and 78 hours for an operation stress with an estimated scale factor of 75 hours and shape factor of 2.3. . Determine the reliability of the units at a time of 70 hours. Find MTTF Find B1 life (98% life) Find median time to failure Find the design life for a reliability of 0.90
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started