Assume the risk of assessing control risk too low is 5% and the tolerable deviation rate is 5%. the auditor selects a sample of 60
Assume the risk of assessing control risk too low is 5% and the tolerable deviation rate is 5%. the auditor selects a sample of 60 items and finds 1 deviation. What is the computed upper deviation rate?
Group of answer choices
5.7
7.7
8.7
6.7