Question
Assuming you appointed as a project engineer by a contract awarded to construct a 132kv transmission network of 500km. prepare a project construction methodology for
Assuming you appointed as a project engineer by a contract awarded to construct a 132kv transmission network of 500km. prepare a project construction methodology for a suitable design for all associated construction stages.
(i) Assume the line passes over a river of 2km, two railway lines, highway road, game park, forest, and a city suburb. Also, make necessary assumptions.
(ii) prepare a progress report considering 100km constructed complete ready to be commissioned.
(iii) if you were given a complete schedule of 8months left and had spent four months. how would you overcome delays in deliverables to complete the project?
(iv) if you were invited to conduct FATs for the supply of the construction materials, which materials would you pass and why?
(v) prepare a commissioning report for the project assuming works are complete
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started