At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used
At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used to do the job, but not every machine can handle every job. If a machine is used at all, there is a (one-time only) setup time required. The relevant times (in minutes) are given below.
Each machine can handle at most two jobs per day, and in addition, since machines 1 and 2 require the same people to do setup, an additional 20 minutes is needed if both machines are used. Determine how to minimize the sum of the setup and machine operation times needed to complete all jobs.
Job 1 Job 2 Job 3 Job 4 Job 5 Setup Time 35 27 40 47 50 42 63 45 40 Machine 1 Machine 2 Machine 3 Machine 4 Machine 5 50 38 37 50 43 55 1 38 32 60 60 40 54Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started