Average Demand per week (D) = 2,500 Average Lead Time (L) = 2 weeks Reorder Point (ROP) = 6,000 Average Lot Size (Q) = 10,000
Average Demand per week (D) = 2,500
Average Lead Time (L) = 2 weeks
Reorder Point (ROP) = 6,000
Average Lot Size (Q) = 10,000