Answered step by step
Verified Expert Solution
Question
1 Approved Answer
b) A system for milling 2x6's has four sensitive components connected in series with reliabilities of 0.93, 0.94, 0.92 and 0.97. According to the
b) A system for milling 2x6's has four sensitive components connected in series with reliabilities of 0.93, 0.94, 0.92 and 0.97. According to the quality department of the lumber mill, the current system lacks reliability. At the manufacturing plant, the engineers have proposed to improve the reliability of the system. The new system still has four components, but the system has a backup for each component. The four backup components all have a reliability of 0.94. What is the reliability of the series (old) system? What is the reliability of the new (proposed) system? If you pay a premium, the manufacturer can improve all four of the backup units to 0.97 (the third option). What is the reliability of the third option? 4. With the booming world economy, the 2x4 lumber consumed in the construction industry is considerably increasing. To obtain the 2x4's that meet the quality requirements the milling system for 2x4's needs to be effective. The following reliability diagram is established. What is the reliability of the milling system?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
To solve the problem lets calculate the reliability for each system Reliability of the Series Old Sy...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started