Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

B The Manager of a Process Plant has requested you to assist him in improving Marks the economic performance of the facility. He has found

B The Manager of a Process Plant has requested you to assist him in improving
Marks
the economic performance of the facility. He has found that he is not meeting the full market demand and wishes to configure his production facility so as to maximise the throughput of the firm.
The production operation has four resources: A, B, C, and D each manned by one operator. Each of these resources has 2400 minutes of operating time available per week from 8am to 4pm per day and can be used on only one operation at a time. There are three products, P, Q and R. Product P sells for 90 per unit and has a maximum demand of 100 units per week. Product Q sells for 100 per unit and has a maximum demand of 100 units per week. Product R sells for 80 per unit and has a maximum demand of 70 units per week. The operating expense for the entire facility is 8,000 per week, exclusive of material costs. 85,000 of capital resources and raw materials are maintained in stock at all times.
The products require production time on the resources and raw materials according to the process flow chart shown on Figure Q4.
Raw Material 1 is purchased for 10 per unit, Raw Material 2 costs 25 per unit, and Raw Material 3 costs 20 per unit.
Producing a unit of Product P requires one unit of Raw Material 1, processed on at Resource A for 15 minutes, then by Resource C for 10 minutes. It also requires one unit of Material 2, processed on at Resource B for 15 minutes, then at Resource C for 5 minutes. One each of these parts is then assembled together with Purchased Part PP1 at Resource D in an operation that takes 15 minutes, after which it is ready for sale as Product P.
Producing a unit of Product Q requires one unit of Raw Material 2, processed on Resource B for 15 minutes, then at C for 5 minutes. It also requires one unit of Raw Material 3, processed on at Resource A for 10 minutes and then at Resource B for 15 minutes. Then one unit of the part from C and one unit of the part from B are assembled together at Resource D in an operation that takes 5 minutes, after which it is ready for sale as Product Q.
Producing a unit of Product R requires one unit of Raw Material 3, and can be processed on resource B(5mins or on resource A (15mins). The relevant process engineer recommends using resource B instead of resource A since it only takes a third of the time.
How many units of P,Q and R(if any) should be produced in order to maximise the economic performance of this facility? Compute the expected Key Performance Indicators (KPIs). Provide a full rationale for your answer.
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management A Managerial Approach

Authors: Jack R. Meredith, Samuel J. Mantel,

7th Edition

470226218, 978-0470226216

More Books

Students also viewed these General Management questions