Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

BACKGROUND Avalanche Corporation produced a variety of ski equipment including skis, bindings, poles and boots. The company marketed its products primarily over the Internet. Product

image text in transcribedimage text in transcribedimage text in transcribed
image text in transcribedimage text in transcribedimage text in transcribed
BACKGROUND Avalanche Corporation produced a variety of ski equipment including skis, bindings, poles and boots. The company marketed its products primarily over the Internet. Product demand uctuated considerably prior to and during the ski season as a function of both the economy and the weather. In the past, Avalanche management used historical data as a basis for developing a production strategy: this approach had proven to be less than satisfactory. Jones presented her rationale for introducing the Avalanche Racer at this time by talking about the growth rate of ski equipment sales over the past five years. Jackson was looking at several different production strategies for the upcoming winter season in conjunction with the Avalanche Racer: she considered producing 15,000, 30,000 or 40,000 units. Avalanche had one major manufacturing facility in Chicago; the company had the capability to employ either a batch flow or line flow manufacturing process. Jackson had just completed an analysis on the costs associated with each process (see Exhibit 1). Jones had just provided Jackson with the sales forecast for the Avalanche Racer, which showed a 60 per cent probability of selling 35,000 units and a 40 per cent probability of selling 25,000 units. The selling price for the Avalanche Racer was $125. Another factor that Jackson needed to keep in mind was that Avalanche had an outside vendor, Snowcap Inc., which could also produce the Racer to Avalanche's specications for a cost of $75 each. Avalanche had a contract with its union workers which clearly specied that outside vendors could only be used in the event that demand exceeded production. Furthermore. unsold units could be sold at a clearance sale for $50. Given all of this information. Jackson decided to use an analytics-based approach to determine the optimal production level. To further compound the situation. Jackson had recently received a proposal from a local consulting rm named Fantastic Forecasters (see Exhibit 2). Jackson knew that this rm had a good track record for predicting upcoming weather conditions valuable information for a winter sports manufacturing company. The fee for developing a forecast was $20,000. Jackson wanted to rst gure out the maximum amount that he would be willing to pay for additional information under ideal conditions. He also realized that he would have to incorporate the consulting rm's cost and performance numbers into the analysis. After that. he could determine how much the sample information was worth so that he could decide whether or not to hire Fantastic Forecasters. Jackson had a lot of work to do and he was eager to get started. His fu'st step was to decide on the best production process; he would need to determine the break-even volume for the two production options (batch and line). Once that task had been accomplished, he planned to determine the net income (revenue cost) for each of the six demand and production options (e.g. demand = 35,000 and production = 15.000) based on the most appropriate production process (batch or line). Having assembled the payoff table. he could then determine the optimal production strategy based on the production level that maximized expected value based on prior marketing probabilities. These steps were reasonably clear; however. assessing the bid 'om Fantastic Forecasters was another thing entirely. Jackson recalled a lecture 'om his graduate days involving a process for revising past probabilities using additional information. A quick Google search revealed that Bayesian analysis would do the trick; specically. Bayesian analysis is an analytical methodology for updating a marketing department's demand probabilities with information supplied by a forecasting consultant. Jackson was also worried about the accuracy of some of the estimates. so he planned to perform sensitivity analysis on some of the more uncertain estimates. Exhibit 1 PROCESS OPTIONS COST Cost / Process Batch Line Fixed cost ($) 475,000 900,000 Variable cost ($/unit) 75 60 Exhibit 2 CONSULTANT PERFORMANCE TABLE Actual / Predicted Predict Heavy Snow Predict Light Snow Heavy snow 0.9 0.1 Light snow 0.25 0.75

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Complex Variables And Applications

Authors: James Brown, Ruel Churchill

9th Edition

0073530859, 9780073530857

More Books

Students also viewed these Mathematics questions

Question

What must a person do to apply?

Answered: 1 week ago