Background information about Teslas factories from their website.Teslas factory in Fremont, California is one of the worlds most advanced automotive plants, with 5.3 million square
Background information about Teslas factories from their website.Teslas factory in Fremont, California is one of the worlds most advanced automotive plants, with 5.3 million square feet of manufacturing and office space on 370 acres of land. Today, more than 10,000 employees work at the Fremont factory. Prior to Tesla, the facility was home to General Motors from 1962 to 1982, then GM and Toyotas New United Motor Manufacturing, Inc (NUMMI) from 1984 until the partnership ended in 2009. Tesla purchased the facility in 2010 and extensively remodeled it before the first Model S rolled off the line in June 2012.As Tesla continues to deliver more and more vehicles to customers around the world, we always aim for the highest possible level of vehicle craftsmanship, with every Model S, Model X and Model 3 built in Fremont, where the vast majority of the vehicles components are also made.
To ramp production to 500,000 cars per year, Tesla alone will require todays entire worldwide supply of lithium-ion batteries. The Tesla Gigafactory was born out of necessity and will supply enough batteries to support Teslas projected vehicle demand. Today, the Gigafactory produces Model 3 electric motors and battery packs, in addition to Teslas energy storage products, Powerwall and Powerpack.
From Teslas 2018 10-k:Cost of automotive sales revenue includes direct parts, material and labor costs, manufacturing overhead, including depreciation costs of tooling and machinery, shipping and logistic costs, vehicle connectivity costs, allocations of electricity and infrastructure costs related to our Supercharger network, and reserves for estimated warranty expenses. Publicly disclosed vehicle production numbers from Teslas Q2 2019 were as follows:
Vehicle Production Numbers:
Model 3: 72,531
Model S/X: 14,517
Total: 87,048
From Teslas public disclosures we can see that overhead allocation is likely very important to them. That is, because they currently make three different models of cars in the same factory, and these different models share some component parts that are also manufactured by Tesla (electric motors and battery packs), there will be many common costs that are not able to be directly traced to each type of model.We do not have information on exactly what overhead costs Tesla has or exactly how Tesla allocates overhead because these are not required financial disclosures. However, lets make some assumptions about their overhead costs and cost drivers and see how using activity-based costing techniques to allocate overhead versus using a single overhead rate might affect their overhead allocations and ultimately their business decisions. Vehicle Production NumbersModel 372,531Model S/X14,517Total87,048
Lets assume Tesla has estimated their total manufacturing overhead costs for the year to be $2,665,000,000 based on the following schedule of expected overhead costs:
Estimated Annual Overhead Costs (all numbers in 000s)
Depreciation Tooling (used to make parts) $220,000
Depreciation - Machinery 740,000
Shipping Costs (for parts used in making both cars) 260,000
Materials Handling Costs 140,000
Utilities (Electricity, water, etc.) 75,000
Depreciation (Fremont Factory) 90,000
Supervisor Salaries 500,000
Set-up Costs 180,000
Engineering Support 215,000
Quality Inspections 245,000
Estimated Total Annual Overhead $2,665,000
Lets also assume that Tesla tracks the following information for each model type that could be used as cost drivers. To simplify things lets just focus on the Model 3 and the Model S.
Possible Cost Driver Information:
Required Case Questions (Parts A F)
Part A: Using the previously provided information calculate the per unit overhead cost for Q2 2019 for Model 3 and Model S based on allocating manufacturing overhead in a normal costing system using machine hours as a single cost driver for manufacturing overhead.
Part B: Select what you believe is the best cost driver for each of the separate overhead costs listed above if Tesla were to use an activity-based costing system. Prepare a schedule that shows the cost driver that should be paired with each overhead cost. You can use a particular cost driver more than once if you believe it is the best cost driver for more than one overhead cost.
Part C: Using the costs drivers you selected for an activity-based costing system in part B above, calculate the per unit overhead cost for Q2 2019 for Model 3 and Model S based on allocating overhead in a normal costing system using an activity-based costing approach.
Part D: Assume that actual overhead for Q2 2019 is $800,000,000. Adjust your calculations under both Parts A and C to reflect the needed adjustment to actual overhead costs. Hint: the adjustment should be made based on the total allocated overhead to each model before adjustment.
Part E: Provide a brief description and analysis of the differences in the overhead costs per unit that you calculated in Parts A and C above (use the amounts after making the required adjustment in part D). This description and analysis should note the amount and direction of any differences in overhead costs across the two methods for each model and should be focused on the specific reasons for the majority of the difference between these two overhead allocation methods.
Part F: Name at least two business decisions that Tesla may make differently if they use an activity-based costing system rather than a single volume-based cost driver to allocate manufacturing overhead. Be sure to describe why these business decisions are likely to change with an activity-based costing system.
Number of units Direct labor hours Number of machine hours Factory square footage* Number of setups Number of inspections Number of unique parts per vehicle* Number of shipments Number of engineering Possible Cost Driver Information Amount for Model 3 Amount for Model S in Q2 2019 in Q2 2019 72,531 9,541 1,589,000 437,529 789,321 124,561 6,000,000 3,500,000 145,062 57,185 6,236,754 1,689,533 Estimated Total Annual Amount 330,000 8,100,000 2,855,000 9,000,000 810,000 31,750,000 8,000 1,800 9,000 950 8,500 11,000 support calls 61,870 580.248.000 19,200 85,869,000 325,000 2,665,500,000 Number of parts Number of engineering support hours Number of unique machines used* 185,610 86,400 1,090,000 200 185 250 * Unlike the other cost drivers listed these items do not increase over time which is why the estimated annual amounts are similar to the Q2 amountsStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started