bAs part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output
bAs part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of units per hour day. Task times and precedence relationships are as follows:
Task Duration
minutes Immediate
Predecessor
a
b a
c b
d
e d
f c
g e f
Do each of the following:
a Determine the number of followers for each task.
b Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. Round all answers up to one decimal point. For example, round up to
c Determine the minimum number of stations needed. Use your rounded cycle time from Part b Round up your answer to a whole number. Note that rounding up to one decimal point may reduce output to slightly less than and this is fine.
d Using the calculated cycle time, assign tasks to workstations on the basis of most following tasks. Use shortest processing time as a tiebreaker. Specify tasks in the exact order they were assigned.
e Compute the percent efficiency and percent idle time for the assignment in part d Note: if the calculated cycle time and the actual bottleneck station time are different, use the actual bottleneck time in your calculations. Round your answers to decimal places
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started