Based on estimates the data for two types of bridges with different lives are as follows. Timber bridge Steel bridge First cost P10,000,000 P28,000,000 Salvage
Based on estimates the data for two types of bridges with different lives are as follows.
| Timber bridge | Steel bridge |
First cost | P10,000,000 | P28,000,000 |
Salvage value | 400,000 | 1,000,000 |
Life in years | 12 | 36 |
Annual maintenance | 1,200,000 | 500,000 |
If minimum rate attractive of return is 9%, determine which project is more desirable using:
- ROR method
- AC method
- PWC method
Step by Step Solution