Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Basic Manufacturing Process with 2 Job Types + Inspection Time between job arrivals at a machining station is exponentially distributed with mean 4.4 minutes. There

image text in transcribed

Basic Manufacturing Process with 2 Job Types + Inspection Time between job arrivals at a machining station is exponentially distributed with mean 4.4 minutes. There are 2 types of jobs to be processed 30% of which is Type 1 and, 70% are of Type 2. Processing times are exponentially distributed. Mean processing time for Type 1 is 4.8 minutes, for Type 2 it is 2.5 minutes. After the job is processed, they go through an inspection process with one single inspector and an inspection time with triangular distribution (1,2,3.5). Inspector decides whether the part is good enough, scrap or should be reworked. 80% of the parts produced is good, 10% is scrap and the rest needs rework. Rework is done by the same manufacturing machine. The priority among the parts will be Part1 first, part2 second and reworks of both type comes later. Rework time is normally distributed with mean 2 minutes and 0,2 std dev. Simulate the system for one 8-hour day. Basic Manufacturing Process with 2 Job Types + Inspection Time between job arrivals at a machining station is exponentially distributed with mean 4.4 minutes. There are 2 types of jobs to be processed 30% of which is Type 1 and, 70% are of Type 2. Processing times are exponentially distributed. Mean processing time for Type 1 is 4.8 minutes, for Type 2 it is 2.5 minutes. After the job is processed, they go through an inspection process with one single inspector and an inspection time with triangular distribution (1,2,3.5). Inspector decides whether the part is good enough, scrap or should be reworked. 80% of the parts produced is good, 10% is scrap and the rest needs rework. Rework is done by the same manufacturing machine. The priority among the parts will be Part1 first, part2 second and reworks of both type comes later. Rework time is normally distributed with mean 2 minutes and 0,2 std dev. Simulate the system for one 8-hour day

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Of Capital In Managerial Finance

Authors: Dennis Schlegel

2015th Edition

3319151347, 978-3319151342

Students also viewed these Finance questions

Question

=+2 Is the decision sustainable in the long run?

Answered: 1 week ago

Question

=+1 Is the decision fair to employees?

Answered: 1 week ago