Question
Basil Tooling uses a standard cost system to account for the costs of its one product. Standards are 4 sheets of -inch steel at $110
Basil Tooling uses a standard cost system to account for the costs of its one product. Standards are 4 sheets of -inch steel at $110 per sheet and 14.0 hours of labor at a standard wage rate of $13.0. During July, Basil Tooling produced 600 units. Materials purchased and used totaled 2,630 sheets at a price of $106. Payroll totaled $113,408 for 8,860 hours worked.
Required:
Calculate the direct materials price variance.
Note: Do not round your intermediate calculations. Indicate the effect of variance by selecting "Favorable", "Unfavorable", or "None" for no effect (i.e., zero variance).
Calculate the direct materials quantity variance.
Note: Indicate the effect of variance by selecting "Favorable", "Unfavorable", or "None" for no effect (i.e., zero variance).
Calculate the direct labor rate variance.
Note: Do not round your intermediate calculations. Indicate the effect of variance by selecting "Favorable", "Unfavorable", or "None" for no effect (i.e., zero variance).
Calculate the direct labor efficiency variance.
Note: Indicate the effect of variance by selecting "Favorable", "Unfavorable", or "None" for no effect (i.e., zero variance).
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started