batch of 2 0 0 parts is to be produced on a CNC tuming machine, each part in the batch has 3 in diameter and

batch of 200 parts is to be produced on a CNC tuming machine, each part in the batch has 3 in diameter and length of 10 in. Each part is to be turned down to 2.88 in in identical several passes using same cutting conditions. The machine uses feed =0.005 in/rev and depth of cut =0.02 in, and a cutting tool having a Taylor tool life parameters n =0.24 and C =1000 ft/min. An operator loads and unloads the machine; the total handling time (loading and unloading) of a part is 2.8 min. and the tool change time is 2.3 min. The machine takes 0.3 min to position the tool for each pass. The cost of the operator and machine = $40/hr, the machine uses 4-cutting-edge cemented carbide inserters; the cost of one insert is 12 S. Determine: (a) Number of passes (b) The time to complete one production cycle at minimum cost (c) Cost of the production cycle.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Essentials of Materials Science and Engineering

Authors: Donald R. Askeland, Wendelin J. Wright

3rd edition

978-1111576868, 1111576866, 978-1285677620, 1285677625, 978-1111576851

More Books

Students also viewed these Mechanical Engineering questions

Question

=+for the shareholder of the acquiring company?

Answered: 1 week ago

Question

=+for the shareholder of the acquired company?

Answered: 1 week ago

Question

=+for the acquired company?

Answered: 1 week ago