Answered step by step
Verified Expert Solution
Question
1 Approved Answer
batch of 2 0 0 parts is to be produced on a CNC tuming machine, each part in the batch has 3 in diameter and
batch of parts is to be produced on a CNC tuming machine, each part in the batch has in diameter and length of in Each part is to be turned down to in in identical several passes using same cutting conditions. The machine uses feed inrev and depth of cut in and a cutting tool having a Taylor tool life parameters n and C ftmin An operator loads and unloads the machine; the total handling time loading and unloading of a part is min. and the tool change time is min. The machine takes min to position the tool for each pass. The cost of the operator and machine $hr the machine uses cuttingedge cemented carbide inserters; the cost of one insert is S Determine: a Number of passes b The time to complete one production cycle at minimum cost c Cost of the production cycle.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started