Beauville Furniture Corporation produces sofas, recliners, and lounge chairs. Beauville is located in a medium-sized community in the southeastern part of the United States. It

Beauville Furniture Corporation produces sofas, recliners, and lounge chairs. Beauville is located in a medium-sized community in the southeastern part of the United States. It is a major employer in the community. In fact, the economic well-being of the community is tied very strongly to Beauville. Beauville operates a sawmill, a fabric plant, and a furniture plant in the same community.

The sawmill buys logs from independent producers. The sawmill then processes the logs into four grades of lumber: firsts and seconds, No. 1 common, No. 2 common, and No. 3 common. All costs incurred in the mill are common to the four grades of lumber. All four grades of lumber are used by the furniture plant. The mill transfers everything it produces to the furniture plant, and the grades are transferred at cost. Trucks are used to move the lumber from the mill to the furniture plant. Although no outside sales exist, the mill could sell to external customers, and the selling prices of the four grades are known.

The fabric plant is responsible for producing the fabric that is used by the furniture plant. To produce three totally different fabrics (identified by fabric ID codes FB60, FB70, and FB80, respectively), the plant has three separate production operationsone for each fabric. Thus, production of all three fabrics occurs at the same time in different locations in the plant. Each fabric's production operation has two processes: the weaving and pattern process and the coloring and bolting process. In the weaving and pattern process, yarn is used to create yards of fabric with different designs. In the next process, the fabric is dyed, cut into 25-yard sections, and wrapped around cardboard rods to form 25-yard bolts. The bolts are transported by forklift to the furniture plant's Receiving Department. All of the output of the fabric plant is used by the furniture plant (to produce the sofas and chairs). For accounting purposes, the fabric is transferred at cost to the furniture plant.

The furniture plant produces orders for customers on a special-order basis. The customers specify the quantity, style, fabric, lumber grade, and pattern. Typically, jobs are large (involving at least 500 units). The plant has two production departments: Cutting and Assembly. In the Cutting Department, the fabric and wooden frame components are sized and cut. Other components are purchased from external suppliers and are removed from stores as needed for assembly. After the fabric and wooden components are finished for the entire job, they are moved to the Assembly Department. The Assembly Department takes the individual components and assembles the sofas (or chairs).

Beauville Furniture has been in business for over two decades and has a good reputation. However, during the past five years, Beauville experienced eroding profits and declining sales. Bids were increasingly lost (even aggressive bids) on the more popular models. Yet, the company was winning bids on some of the more-difficult-to-produce items. Lance Hays, the owner and manager, was frustrated. He simply couldn't understand how some of his competitors could sell for such low prices. On a common sofa job involving 500 units, Beauville's bids were running $25 per unit, or $12,500 per job more than the winning bids (on average). Yet, on the more difficult items, Beauville's bids were running about $60 per unit less than the next closest bid. Gisela Berling, vice president of finance, was assigned the task of preparing a cost analysis of the company's product lines. Lance wanted to know if the company's costs were excessive. Perhaps the company was being wasteful, and it was simply costing more to produce furniture than it was costing its competitors.

Gisela prepared herself by reading recent literature on cost management and product costing and attending several conferences that explored the same issues. She then reviewed the costing procedures of the company's mill and two plants and did a preliminary assessment of their soundness. The production costs of the mill were common to all lumber grades and were assigned using the physical units method. Since the output and production costs were fairly uniform throughout the year, the mill used an actual costing system. Although Gisela had no difficulty with actual costing, she decided to

explore the effects of using the sales-value-at-split-off method. Thus, cost and production data for the mill were gathered so that an analysis could be conducted. The two plants used normal costing systems. The fabric plant used process costing, and the furniture plant used job-order costing. Both plants used plantwide overhead rates based on direct labor hours. Based on her initial reviews, she concluded that the costing procedures for the fabric plant were satisfactory. Essentially, there was no evidence of product diversity. A statistical analysis revealed that about 90 percent of the variability in the plant's overhead cost could be explained by direct labor hours. Thus, the use of a plantwide overhead rate based on direct labor hours seemed justified. What did concern her, though, was the material waste that she observed in the plant. Maybe a standard cost system would be useful for increasing the overall cost efficiency of the plant. Consequently, as part of her report to Lance, she decided to include a description of the fabric plant's costing proceduresat least for one of the fabric types. She also decided to develop a standard cost sheet for the chosen fabric. The furniture plant, however, was a more difficult matter. Product diversity was present and could be causing some distortions in product costs. Furthermore, statistical analysis revealed that only about 40 percent of the variability in overhead cost was explained by the direct labor hours. She decided that additional analysis was needed so that a sound product costing method could be recommended. One possibility would be to increase the number of overhead rates. Thus, she decided to include departmental data so that the effect of moving to departmental rates could be assessed. Finally, she also wanted to explore the possibility of converting the sawmill and fabric plant into profit centers and changing the existing transfer pricing policy.

With the cooperation of the cost accounting manager for the mill and each plant's controller, she gathered the following data for last year:

Sawmill:Joint manufacturing costs: $900,000GradeQuantity Produced

(board feet)Price at Split-Off

(per 1,000 board foot)Firsts and seconds1,500,000$300No. 1 common3,000,000225No. 2 common1,875,000140No. 3 common1,125,000100Total7,500,000Fabric Plant:Budgeted overhead: $1,200,000 (50% fixed)

Practical volume (direct labor hours): 120,000 hours

Actual overhead: $1,150,000 (50% fixed)

Actual hours worked:GradeWeaving and

PatternColoring and

BoltingTotalFabric FB6020,00012,00032,000Fabric FB7028,00014,00042,000Fabric FB8026,00018,00044,000Total74,00044,000118,000

Departmental data on Fabric FB70 (actual costs and actual outcomes):

Weaving and

PatternColoring and

BoltingBeginning inventoriesUnits*20,000400Costs:Transferred in$0$100,000Materials$80,000$8,000Labor$18,000$6,600Overhead$22,000$9,000Current production:Units started80,000?Units transferred out80,0003,200Costs:Transferred in$0?Materials$320,000$82,000Labor$208,000$99,400Overhead??Percentage completion:Beginning inventory30%40%Ending inventory40%50%

*Units are measured in yards for the Weaving and Pattern Department and in bolts for the Coloring and Bolting Department. Note: With the exception of the cardboard bolt rods, materials are added at the beginning of each process. The cost of the rods is relatively insignificant and is included in overhead.

Proposed standard cost sheet for Fabric FB70 (for the Coloring and Bolting Department only):

Transferred-in materials (25 yards @ $10)$250.00Other materials (100 ounces @ $0.20)20.00Labor (3.1 hours @ $8)24.80Fixed overhead (3.1 hours @ $5)15.50Variable overhead (3.1 hours @ $5)15.50Standard cost per unit$325.80

Furniture Plant:Departmental data (budgeted):Service DepartmentsProducing DepartmentsReceivingPowerMaintenanceGeneral

FactoryCuttingAssemblyOverhead$450,000$600,000$300,000$525,000$750,000$375,000Machine hours----60,00015,000Receiving orders----13,5009,000Square feet1,0005,0004,000-15,00010,000Direct labor hours----50,000200,000

After some discussion with the furniture plant controller, Gisela decided to use machine hours to calculate the overhead rate for the Cutting Department and direct labor hours for the Assembly Department rate (the Cutting Department was more automated than the Assembly Department). As part of her report, she wanted to compare the effects of plantwide rates and departmental rates on the cost of jobs. She wanted to know if overhead costing could be the source of the pricing problems the company was experiencing.

To assess the effect of the different overhead assignment procedures, Gisela decided to examine two prospective jobs. One job, Job A500, could produce 500 sofas, using a frequently requested style and Fabric FB70. Bids on this type of job were being lost more frequently to competitors. The second job, Job B75, would produce 75 specially designed recliners. This job involved a new design and was more difficult for the workers to build. It involved some special cutting requirements and an unfamiliar assembly. Recently, the company seemed to be winning more bids on jobs of this type. To compute the costs of the two jobs, Gisela assembled the following information on the two jobs:

Job A500:Direct materials:Fabric FB70180 bolts @ $350Lumber (No. 1 common)20,000 board feet @ $0.12Other components$26,600Direct labor:Cutting Department400 hours @ $10Assembly Department1,600 hours @ $8.75Machine time:Cutting Department350 machine hoursAssembly Department50 machine hoursJob B75:Direct materials:Fabric FB7026 yards @ $350Lumber (first and seconds)2,200 board feet @ $0.12Other components$3,236Direct labor:Cutting Department70 hours @ $10Assembly Department240 hours @ $8.75Machine time:Cutting Department90 machine hoursAssembly Department15 machine hours

For each of the overhead rates computed in Requirement 9, calculate unit bid prices for Jobs A500 and B75. Round your answers to two decimal places.

Unit BidPlantwide ratesJob A500$fill in the blank 61

Job B75$fill in the blank 62

Departmental rates.Job A500$fill in the blank 63

Job B75$fill in the blank 64

Assume that the company's aggressive bidding policy is unit cost plus 50 percent. Did departmental overhead rates have any effect on Beauville's winning or losing bids? What recommendation would you make? Explain. Round your answers to two decimal places.

Departmental ratesdecrease

the bid for the moreeasily

produced Job A500 andincrease

the bid for the moredifficult to

produce Job B75. This appears to be in the right direction. We would recommend using thedepartmental rates

.

Now, adjust the costs and bids for departmental rate bids using the proposed standard costs for the Coloring and Bolting Department. Did this make a difference? What does this tell you? Round your answers to two decimal places. Enter all amounts as positive numbers.

Standard cost woulddecrease

the cost of Fabric FB70 for both jobs. For Job A500, prime costs willdecrease

by $fill in the blank 72

. And for Job B75, prime costs willdecrease

by $fill in the blank 74

. Thus, the bid for Job A500 willdecrease

by $fill in the blank 76

. Similarly, the bid for Job B75 willdecrease

by $fill in the blank 78

This tells us that wecan

apparently avoid including waste in our bid by using standard costs andimprove

our bidding. It also tells us that we need to focus on becomingmore

efficient.

11.Suppose that the fabric plant is set up as a profit center. Bolts of Fabric FB70 sell for $400 (or can be bought for $400 from outside suppliers). The fabric plant and the furniture plant both have excess capacity. Assume that Job A500 is a special order. The fabric and furniture plants have sufficient excess capacity to satisfy the demands of Job A500. What is the minimum transfer price for a bolt of FB70? Round your answers to two decimal places.

$fill in the blank 82

If the maximum transfer price is $400, by how much do the fabric plant's profits increase?

$fill in the blank 83

If the two profit centers negotiate a transfer price that splits the joint benefit?

$fill in the blank 84

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting for Governmental and Nonprofit Entities

Authors: Jacqueline L. Reck, James E. Rooks, Suzanne Lowensohn, Daniel Neely

18th edition

1260190080, 1260190083, 978-1259917059

More Books

Students also viewed these Accounting questions

Question

=+c) Compute the CV and RRR for each decision.

Answered: 1 week ago

Question

13. Give four examples of psychological Maginot lines.

Answered: 1 week ago