Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Before the excavators were purchased, a reliability engineer did some reliability block modelling of the sub-system comprising the bucket, teeth and a lift cylinder system

Before the excavators were purchased, a reliability engineer did some reliability block modelling of the sub-system comprising the bucket, teeth and a lift cylinder system and a hydraulic pump. He/she assumed each component lifetime has an Exponential distribution. Assuming the MTBF is 15000 hours for the bucket, 900 for the teeth, 10000 for the lift cylinder system and 12000 for the hydraulic pump. What is the reliability for the sub-system over one month (450 hour) period? [The subsystem fails if one of the components fails.]

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Geometry From Euclid To Knots

Authors: Saul Stahl

1st Edition

0486134989, 9780486134987

More Books

Students also viewed these Mathematics questions