Below is a detailed activity of a project. Based on the above, indicate the number of days it's going to be finished. B. Activity ABCDEFGHINKLMN
Below is a detailed activity of a project.
Based on the above, indicate the number of days it's going to be finished.
B.
Activity ABCDEFGHINKLMN Activity Description Excavate Lay the foundation Put up the rough wall Put up the roof Install the exterior plumbing Install the interior plumbing Put up the exterior siding Do the exterior painting Do the electrical work Put up the wallboard Install the flooring Do the interior painting Install the exterior fixtures Install the interior fixtures Immediate Predecessors ABCCE Estimated Duration 2 weeks 4 weeks 10 weeks 6 weeks 4 weeks 5 weeks D 7 weeks E, G 9 weeks 7 weeks FI 8 weeks 4 weeks 5 weeks H 2 weeks K, L 6 weeks
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started