Answered step by step
Verified Expert Solution
Question
1 Approved Answer
BIDA Thrive is a college located in the West coast of Scotland. It has recently been awarded funding by the Scottish Government to build a
BIDA Thrive is a college located in the West coast of Scotland. It has recently been awarded funding by the Scottish Government to build a department on the newly developed campus site, miles away from its existing location. This funding will only cover part of the total cost to build and run the new department over the next years. The remainder of the cost will be funded by other investors.
The college needs to choose a heating system for the new department and is considering the following choices: a traditional boiler system, solar powered panels or a wind operated system.
If the college chooses to use a traditional boiler system, there will be a capital cost of In addition to this, the estimated annual heating cost will be
If the college chooses to install solar powered panels, there will be a capital cost of This covers the cost of both the solar powered panels and a backup heating system for use when the solar powered panels are unable to provide enough energy. The annual cost of using the solar powered panels will be
There is a probability that the solar powered panels will be able to provide all the heating required throughout the year due to sufficient hours of sunshine. However, if the solar powered panels cannot provide all of the energy required, the backup system will be used and will cost an additional per year.
If BIDA Thrive chooses to install a wind operated system, there will be a capital cost of Due to the location of the college, there will be sufficient wind to power the heating from this system without the need for any backup system. The annual cost of the heating from this system will be
However, the college has been told that there will be an additional annual cost of maintenance for the wind powered system. The system will have either a low, medium or high number of faults and thus the maintenance cost will differ for each of these situations. There is a probability that the system will have a low number of faults with an annual maintenance cost of There is a probability that the system will have a medium number of faults, resulting in an annual maintenance cost of A high number of faults will result in an annual cost of
What should BIDA Thrive do based on the option that minimises the expected cost over the next years?
a to choose a traditional boiler
b to choose a solar system
c to either choose a solar system or a wind powered system
d to choose a wind powered system
What is the expected value associated with the most beneficial course of action?
a
b
c
d
e
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started