Answered step by step
Verified Expert Solution
Question
1 Approved Answer
BILD-RITE Inc., makes two products and is currently using a predetermined overhead rate based on direct labour hours to apply overhead. The total estimated overhead
BILD-RITE Inc., makes two products and is currently using a predetermined overhead rate based on direct labour hours to apply overhead. The total estimated overhead cost is $864,000 for the coming year. Data for these products for the upcoming year is shown below: Direct Materials Cost per Unit Direct Labour Cost per Unit Direct Labour Hours per Unit Number of Units Produced Product A $19.50 $9.00 0.6 30,000 Product B $33.00 $4.50 0.3 120,000 These products do have some level of customization for each specific customer. Management is now considering the implementation of an activity-based costing system where 50% of the overhead would continue to be allocated on the basis of direct labour hours and the remainder allocated on the basis of engineering design time. The time is expected to be distributed as follows for the upcoming year: Product A 4.500 Product B 4,500 Total 9,000 Engineering Design Time (in hours) Calculate the total product cost per unit for product A using the proposed activity-based-costing system. [COSTA] Enter your answer with no rounding. Enter the dollar and decimal and cents. For example: 46.78 do not enter dollar signs
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started