Blerce Corporation has two manufacturing departments-Machining and Finishing. The company used the following data at the beginning of the year to calculate predetermined overhead rates: Estimated total machine-hours (uHs) Estimated total fixed manufacturing overhead cost Estimated variable manufacturing overhead cost per MH During the most recent month, the company started and completed two jobs-Job B and Job K. There were no beginning inventorles. Data concerning those two jobs follow: DirectmaterialsDirectlaborcostMachiningmachine-hoursFinishingmachine-hoursJobB51,60022,1002,5002,000JobK5,0005,5005005,000 Required: a. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate that overhead rate. (Round your answer to 2 declmal places.) b. Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate the amount of manufacturing overhead applied to Job B. (Do not round intermedlate calculations.) c. Assume that the compary uses a plantwide predetermined manufacturing overhead rate based on machine-hours. Calculate the amount of manufacturing overhead applied to Job K. (Do not round intermedlate calculations. Round your answer to the nearest whole dollar amount.) d. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. What is the departmental predetermined overhead rate in the Machining department? (Round your answer to 2 decimal places.) e. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. What is the departmental predetermined overhead rate in the Finishing department? (Round your answer to 2 declmal places.) f. Assume that the company uses departmental predeterinined overhead rates with machine-hours as the allocation base in both production departments. How much manufacturing overhead will be applled to Job B? (Do not round intermedlate calculations) g. Assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both production departments. How much manufacturing overhead will be applled to Job K? (0) not round Intermedlate, ealeulationes)