Bluebird Tire manufactures tires for all-terrain vehicles. BluebirdBluebird uses job costing and has a perpetual inventory system. On NovemberNovember 22, BluebirdBluebird received an order for

Bluebird Tire manufactures tires for all-terrain vehicles.

BluebirdBluebird

uses job costing and has a perpetual inventory system. On

NovemberNovember

22,

BluebirdBluebird

received an order for

170170

TX tires from ATV Corporation at a price of

$ 75$75

each. The job, assigned number 298, was promised for

DecemberDecember

10. After purchasing the materials,

BluebirdBluebird

began production on

NovemberNovember

30 and incurred the following direct labor and direct materials costs in completing the order:

LOADING...

(Click the icon to view the costs.)

BluebirdBluebird

allocates manufacturing overhead to jobs on the basis of the relation between expected overhead costs

($ 396 comma 000$396,000)

and expected direct labor hours

(18 comma 00018,000).

Job 298 was completed on

DecemberDecember

3 and shipped to ATV on

DecemberDecember

5.Read the requirements

LOADING...

.

Requirement 1. Prepare a job cost record for Job 298.

Calculate the predetermined overhead rate, then apply manufacturing overhead to the job. Begin by identifying the formula and computing the predetermined overhead rate.

Estimated yearly overhead costs

/

Estimated yearly direct labor hours

=

Predetermined overhead rate

$396,000

/

18,000

=

$22

per hour

Complete the job cost record in order of direct materials, direct labor, and allocated manufacturing overhead. Then prepare the overall cost summary. (List the dates in chronological order. Enter the labor time records in the correct row according to date. Complete only necessary answer boxes. If a box is not used in the table leave the box empty; do not enter a zero.)

Job Cost Record

Job No.

298

Customer Name

ATV Corporation

Job Description

170 TX tires

Date Promised 12-10

Direct Materials

Requisition

Date

Number

Amount

20XX

1130

437

$720

122

439

400

123

501

1,400

Totals

$2,520

Date Started 11-30

Direct Labor

Labor Time

Record

Number

Amount

1896

$216

1904

480

$696

Date Completed 12-3

Manufacturing Overhead Allocated

Date

Rate

Amount

123

per

direct labor hr.

Overall Cost Summary

Direct Materials

Direct Labor

Manufacturing Overhead

Allocated

Total Job Cost

Choose from any list or enter any number in the input fields and then click Check Answer.

1

part remaining

Clear All

Final Check

Data Table

Date

Labor Time Record No.

Description

Amount

11/30

1896

12 hours at $18

$216

12/3

1904

30 hours at $16

$480

Materials

Requisition

Date

No.

Description

Amount

11/30

437

60 lbs. rubber at $12

$720

12/2

439

40 meters polyester fabric at $10

$400

12/3

501

100 meters steel cord at $14

$1,400

PrintDone

Requirements

1.

Prepare a job cost record for Job 298.

2.

Calculate the total profit and the per-unit profit for Job 298.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Accounting questions

Question

What is the source of the basaltic lavas of the midoceanic ridges?

Answered: 1 week ago

Question

Comment should this MNE have a global LGBT policy? Why/ why not?

Answered: 1 week ago