Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: Denominator volume-number of units Denominator
Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: Denominator volume-number of units Denominator volume-percent of capacity Denominator volume-standard direct labor hours (DLHS) Budgeted variable factory overhead cost at denominator volume Total standard factory overhead rate per DLH 8,000 80% 24,000 $103,200 $ 15.10 During 2019, Bluecap worked 28,000 DLHs and manufactured 9,600 units. The actual factory overhead cost for the year was $14,000 greater than the flexible budget amount for the units produced, of which $6,000 was due to fixed factory overhead. In preparing a budget for 2020 Bluecap decided to raise the level of operation to 90% of capacity (a level it considers to be "practical capacity"), to manufacture 9,000 units at a budgeted total of 27,000 DLHS. Under the assumption that the total budgeted fixed overhead for 2020 is the same as it was for 2019, what is the standard fixed overhead application rate per DLH (to two (2) decimal places) for Bluecap Co. for 2020? o $4.30. o $4.50. o $6.90. o $9.30. o $9.60
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started