Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Borealis Manufacturing has just completed a major change in its quality control (QC) process. Previously, products had been reviewed by OC inspectors at the end

image text in transcribed
Borealis Manufacturing has just completed a major change in its quality control (QC) process. Previously, products had been reviewed by OC inspectors at the end of each major process, and the company's 10 QC inspectors were charged as direct labor to the operation or job. In an effort to improve efficiency and quality, a computerized video QC system was purchased for $250,000. The system consists of a minicomputer, 15 video cameras, other peripheral hardware, and software. The new system uses cameras stationed by QC engineers at key points in the production process. Each time an operation changes or there is a new operation, the cameras are moved, and a new master picture is loaded into the computer by a QC engineer. The camera takes pictures of the units in process, and the computer compares them to the picture of a "good" unit. Any differences are sent to a QC engineer, who removes the bad units and discusses the flaws with the production supervisors. The new system has replaced the 10 QC inspectors with two QC engineers. The operating costs of the new QC system, including the salaries of the QC engineers, have been included as factory overhead in calculating the company's plantwide manufacturing-overhead rate, which is based on direct-labor dollars. The company's president is confused. His vice president of production has told him how efficient the new system is. Yet there is a large increase in the overhead rate. The computation of the rate before and after automation is as follows: Before After Budgeted manufacturing overhead $1.900,000 $2.100,000 Budgeted direct-labor cost 1.000.000 700.000 Budgeted overhead rate 190% 300% "Three hundred percent." lamented the president. "How can we compete with such a high overhead rate?" Required: 1. a. Define "manufacturing overhead," and cite three examples of typical costs that would be included in manufacturing overhead. 6. Explain why companies develop predetermined overhead rates 2. Explain why the increase in the overhead rate should not have a negative financial impact on Borealis Manufacturing 3. Explain how Borealis Manufacturing could change its overhead application system to eliminate confusion over product costs 4. Discuss how an activity-based costing system might benefit Borealis Manufacturing

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management And Cost Accounting

Authors: Alnoor Bhimani, Srikant M. Datar, Charles T. Horngren, Madhav V. Rajan

7th Edition

1292232668, 978-1292232669

More Books

Students also viewed these Accounting questions