Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Bottling->apply a lid-> labeling -> packaging A) What is the capacity (bottles/hour) at the resource apply a lid B) what is the bottleneck in the
Bottling->apply a lid-> labeling -> packaging
A) What is the capacity (bottles/hour) at the resource "apply a lid"
B) what is the bottleneck in the process?
C) Assuming unlimited demand, what would be the flow rate?
D) Assuming unlimited demand, what would be the utilization at resource "apply a lid"?
E) Assume the process started empty and that this is a machine-paced process. How long would it take to produce 500 bottles?
PA 3-4 A small, privately owned Asian company.. A small, privately owned Asian company is producing a private-label soft drink Yoggo. A bottling line puts the soft drinks into plastic bottles and then packages the bottles into boxes holding 10 bottles each. The bottling line is comprised of the following 4 steps: (1) the bottling machine takes 1 second to fill a bottle, (2) the lid machine takes 3 seconds to cover the bottle with a lid, (3) a labeling machine takes 3 seconds per bottle, and (4) the packaging machine takes 4 seconds to place a bottle into a box. When a box has been filled with 10 bottles, a worker tending the packaging machine removes the filled box and replaces it with an empty box. Assume that the time for the worker to remove a filled box and replace it with an empty box is negligible and hence does not afrect the capacity of the line Number of machines Seconds per bottle Process step Bottling Apply a lid Labeling PackagingStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started