Question
Brandon River flows through an urban area. Due to there have been occasional floods caused damage to properties in this area, a flood control project
Brandon River flows through an urban area. Due to there have been occasional floods caused damage to properties in this area, a flood control project has been proposed. Estimates have been made for two alternative designs, one involving channel improvement (CI) and the other involving a dam and reservoir (D&R). The estimated project life is 50 years and MARR is 8%.
Flood damages are expected to be 780.000 $ per year if the present condition of no flood control (NFC) is continued. The alternative CI will reduce this figure to 200.000 $ and D&R will reduce it to 70.000 $. The initial cost of CI is 3,2 million $ and estimated annual operation and maintenance cost is 50.000 $. The initial cost of D&R is 6,5 million $ and estimated annual operation and maintenance cost is 100.000 $.
D&R alternative has also two types of adverse consequences for the public related to the conservation of natural resources. These negative benefits are as follows: The dam will cause a damage to nearby fisheries; priced at 56.000 $ per year. The reservoir will cause a loss of land for agricultural purposes, priced at 30.000 $ per year. Decide which alternative to choose by B/C analysis.
Please not in excel
a) Use Annual Equivalent Values
b) Use Present Worth Values with unequal service lives as follow:
Alternatives | Service Life |
No Flood Control(NFC) | 10 Years |
Channel Improvement(CI) | 15 Years |
Dam and Reservoir(DR) | 30 Years |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started