Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo, New York. After final assembly and painting,

image text in transcribed
Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds. The following data were collected. Line Number of Speed Defective Parts Found 20 24 20 20 30 19 30 17 40 14 40 16 50 15 50 11 (a) Develop a scatter diagram with the line speed as the independent variable. 2 25 25 25 20 20 20 15 15 15 Number of Defective Parts Number of Defective Parts Number of Defective Parts 10 10 10 10 20 30 40 50 60 10 20 30 40 50 60 10 20 30 40 50 60 O Line Speed (feet per minute) Line Speed (feet per minute) Line Speed (feet per minute) 25 Number of Defective Parts 10 0 10 20 30 40 50 60 O Line Speed (feet per minute) (b) What does the scatter diagram developed in part (a) indicate about the relationship between the two variables? There appears to be a positive relat ship between line speed (feet per minute) and the number of defective parts There appears to be a negative relationship between line speed (feet per minute) and the number of defective parts. There appears to be no noticeable relationship between line speed (feet per minute) and the number of defective parts. (c) Use the least squares method to develop the estimated regression equation. y = (d) Predict the number of defective parts found for a line speed of 45 feet per minute

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Nonlinear Systems And Their Remarkable Mathematical Structures Volume 3, Contributions From China

Authors: Norbert Euler, Da jun Zhang

1st Edition

1000423301, 9781000423303

More Books

Students also viewed these Mathematics questions

Question

Differentiate between indirect labor and expense labor.

Answered: 1 week ago