Question
Briggs Excavation Company is planning an investment of $169,200 for a bulldozer. The bulldozer is expected to operate for 1,000 hours per year for six
Briggs Excavation Company is planning an investment of $169,200 for a bulldozer. The bulldozer is expected to operate for 1,000 hours per year for six years. Customers will be charged $135 per hour for bulldozer work. The bulldozer operator costs $31 per hour in wages and benefits. The bulldozer is expected to require annual maintenance costing $10,000. The bulldozer uses fuel that is expected to cost $41 per hour of bulldozer operation.
Present Value of an Annuity of $1 at Compound Interest | |||||
Year | 6% | 10% | 12% | 15% | 20% |
1 | 0.943 | 0.909 | 0.893 | 0.870 | 0.833 |
2 | 1.833 | 1.736 | 1.690 | 1.626 | 1.528 |
3 | 2.673 | 2.487 | 2.402 | 2.283 | 2.106 |
4 | 3.465 | 3.170 | 3.037 | 2.855 | 2.589 |
5 | 4.212 | 3.791 | 3.605 | 3.352 | 2.991 |
6 | 4.917 | 4.355 | 4.111 | 3.784 | 3.326 |
7 | 5.582 | 4.868 | 4.564 | 4.160 | 3.605 |
8 | 6.210 | 5.335 | 4.968 | 4.487 | 3.837 |
9 | 6.802 | 5.759 | 5.328 | 4.772 | 4.031 |
10 | 7.360 | 6.145 | 5.650 | 5.019 | 4.192 |
a. Determine the equal annual net cash flows from operating the bulldozer. Use a minus sign to indicate cash outflows.
b. Determine the net present value of the investment, assuming that the desired rate of return is 20%. Use the present value of an annuity of $1 table above. Round to the nearest dollar. If required, use the minus sign to indicate a negative net present value.
Present value of annual net cash flows | $fill in the blank e2a5ff08afa202b_1 |
Amount to be invested | $fill in the blank e2a5ff08afa202b_2 |
Net present value | $fill in the blank e2a5ff08afa202b_3 |
c. Should Briggs Excavation invest in the bulldozer, based on this analysis? Yes , because the bulldozer cost is less than the present value of the cash flows at the minimum desired rate of return of 20%.
d. Determine the number of operating hours such that the present value of cash flows equals the amount to be invested. Round interim calculations and final answer to the nearest whole number. fill in the blank e2a5ff08afa202b_6 hours
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started