Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Budget Performance Report Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are
Budget Performance Report Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows: Cost Category Standard Cost per 100 Two-Liter Bottles Direct labor $1.5 Direct materials 5.18 Factory overhead 0.38 Total $7.06 At the beginning of July, GBC management planned to produce 540,000 bottles. The actual number of bottles produced for July was 583,200 bottles. The actual costs for July of the current year were as follows: Cost Category Actual Cost for the Month Ended July 31 Direct labor $8,573 Direct materials 29,485 Factory overhead 2,238 Total $40,296 Enter all amounts as positive numbers. a. Prepare the July manufacturing standard cost budget (direct labor, direct materials, and factory overhead) for WBC, assuming planned production. Genie in a Bottle Company Manufacturing Cost Budget For the Month Ended March 31 Standard Cost at Planned Volume (540,000 Bottles) Manufacturing costs: Direct labor Direct materials Factory overhead Total b. Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Round your answers to two decimal places. Genie in a Bottle Company Manufacturing Costs-Budget Performance Report For the Month Ended March 31 Standard Cost Cost at Actual Variance- Volume (583,200 (Favorable) Bottles) Unfavorable Actual Costs Manufacturing costs: Direct labor Direct materials Factory overhead Total manufacturing cost than budgeted. Favorable direct labor and direct material cost variances more than offset a small c. The Company's actual costs were $877.92 more favorable factory overhead cost variance
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started